Since the 1970s the stadium, which originates from 1920, has been extended in different phases. In this last extension, 13 more rows of seats were added to the south stand; to this end the roof was raised and had to be anchored in the canopy of the adjacent west and east stands ARTPAVILION The space […]
Category: MICRO-COMPACT НОМЕ
RESIDENTIAL AND OFFICE BUILDING WITH UNDERGROUND GARAGE
The building has the function to mark the transition between two urban situations this »s particularly characterized by a tower-like building section containing apartments Two different kinds of facades dominate the outside. ІSSttlal-‘h чмкаялййй. шш ‘ Щгікг, •
UPTOWN MUNCHEN
01 The ensemble consists of a 146 meter-high tower and foui seven-story Campus buildings, whose interconnected lamella roof demarcates the East – West Axis along the boulevard The tower is a counterweight for this horizontal form and has become a distinct silhouette on Munich’s skyline. ІС о a о: VLVtsb’x. ol’ і5»і03 йгйсм nr, 06 […]
EMPLOYEE PARKING GARAGE
This орел employee parking garage for BMW AG with approximately 1000 spaces on nine split levels and two stairways was constructed using a steel frame.
GALLERIA HOUSE
The gallery with a glass root, a hallway, flooded in light and with green plants is not only a spacious entrance zone for all 172 apartments The access balconies, stairs, bridges and plants also transmit an open and communicative atmosphere all year round.